APDS VIET NAM LIMITED

PROJECT INFOMATION

Overview
On May 16, 2025, MYKHA Vietnam officially launched the project to supply heavy industrial lifting and transportation equipment to APDS VIET NAM LIMITED, a unit specializing in the field of offshore engineering and services. The project was implemented in Vung Tau, where many large oil and gas – energy projects in Vietnam are concentrated.

With strict technical requirements, complex operating environment and high safety standards, the project is a testament to MYKHA’ comprehensive technical, logistics and industrial consulting capabilities in the fields of offshore lifting, structure installation and heavy load transportation in deep sea areas.

Technical requirements and standards of the project
For the purpose of serving the offshore transportation and installation process, all equipment provided by MYKHA must meet strict requirements on:

  • Withstand large loads, lifting capacity from several hundred to several thousand tons
  • Resistance to seawater corrosion, salt wind and harsh weather conditions
  • Compatible with offshore cranes and lifting systems
  • Comply with international standards: DNV 2.7-1/2.7-3, API, ABS, LEEA, EN
  • Have full certificates of inspection, load testing and operational safety

Solutions provided by MYKHA
Heavy lifting equipment

MYKHA provides a complete set of equipment for offshore transportation, loading and unloading and installation, including:

  • Specialized steel wire rope: hard core, anti-abrasion coating, with a load capacity of 5–100 tons.
  • Offshore basket: anti-rollover, impact-resistant design, convenient for lifting small equipment and materials from ships to rigs.
  • Offshore container: reinforced frame, safety door, suitable for storing and transporting technical materials, maintenance tools, flammable and explosive goods.
  • Shackle, hook, sling: lifting accessories with clear load certificates, periodically inspected and used in all offshore conditions.

Consulting on solutions & operational techniques

  • MYKHA consults on calculating lifting loads suitable for each type of equipment, ensuring safety and optimizing operating time.
  • Providing technical drawings, product specifications and accompanying user manuals.
  • Consulting on periodic re-inspection, maintenance, replacement of consumables according to manufacturer recommendations and actual offshore operating conditions.

Delivery and logistics services

  • Delivery from MYKHA transit warehouse in Vung Tau
  • Process urgent orders within 24 hours when customers have urgent requests
  • Transport directly to ports, logistics ships or gathering points near drilling rigs

Benefits for APDS VIET NAM LIMITED

  • Ensure absolute safety in offshore operations and lifting
  • Save time by not having to wait for equipment imports from abroad
  • Optimize work efficiency thanks to standard, durable equipment
  • Reduce maintenance and replacement costs because MYKHA provides synchronous products, with inspection

Commitment from MYKHA
With more than 10 years of experience in the field of supplying industrial and marine engineering equipment, MYKHA commits to:

  • Products that meet international standards, full safety inspection
  • Clear after-sales service and warranty, lifetime technical support
  • Advice on demand – supply the right type – deliver on time
  • Expand long-term cooperation, become a become a strategic partner in APDS’s offshore installation projects

The cooperation project between MYKHA and APDS VIET NAM LIMITED not only affirms MYKHA’s capacity to supply heavy industrial equipment, but also opens up a broad development orientation in the field of offshore rig support services, transportation and installation – a field that requires high expertise, absolute precision and maximum safety responsibility.